宁波市TPG_AC7120认证_AC7120_电路卡组件的审核标准(9)
相关推荐
-
Forms and Components | Online Documentation for Altium Products
Contents Overview of Graphical Components Designing Script Forms Creating a New Script Form Displayi ...
-
嘉兴市TPG_AC7120认证_AC7120_电路卡组件的审核标准(1)
嘉兴市TPG_AC7120认证_AC7120_电路卡组件的审核标准(1)
-
保定市TPG_AC7120认证_AC7120_电路卡组件的审核标准(2)
2.2 Instructions to Supplier to be Audited 2.2.1 Prior to the Audit The supplier must have completed ...
-
成都市TPG_AC7120认证_AC7120_电路卡组件的审核标准(3)
2.3 Definition of Terms Terms and definitions shall be in accordance with IPC-T-50 and a PRI Quality ...
-
张家港TPG_AC7120认证_AC7120_电路卡组件的审核标准(4)
3.1 Audit Scope Note: Both "Performed On-site" and "Outsourced" boxes can be mar ...
-
长沙市TPG_AC7120认证_AC7120_电路卡组件的审核标准(5)
5 PROCEDURE FOR PROCESS CONTROL 5.1.P If solder alloys / flux are not specified by customer, is ther ...
-
哈尔滨TPG_AC7120认证_AC7120_电路卡组件的审核标准(6)
7 CAD / CAM DATA N/A 7.1.P Is there a procedure for CAD/CAM data processing? YES/NO CAD / CAM DATA C ...
-
深圳TPG_AC7120认证_AC7120_电路卡组件的审核标准(7)
9 RECEIPT, INSPECTION & CONTROL OF INCOMING MATERIAL 9.1.P Are there procedures that define: a.P ...
-
嘉兴市TPG_AC7120认证_AC7120_电路卡组件的审核标准(8)
11 PROGRAMMING N/A 11.1 Component Programming (prior to assembly) N/A 11.1.1.P Are there procedures ...
-
昆明TPG_AC7120认证_AC7120_电路卡组件的审核标准(10)
13 STENCIL PRINTING N/A 13.1.P Are there procedures that define: a.P - Validation of solder paste pe ...