济南市MedAccred _AC8102热处理基准审核标准【3】
相关推荐
-
新加坡政府强制开发商使用预制整体卫浴(PBU)
思考一 建筑工业化不是铝模,也不是PC,也不是钢结构. 而是一种综合应用,综合解决方案. 一定是要有顶层设计的!! 思考二 为什么新加坡强制使用的整体卫浴是PC和轻钢两种形式的? 在开发产品的时候有没 ...
-
临研圈
Routine Monitoring visits are basically any visit that occurs after the site is initiated and up unt ...
-
广东省MedAccred _AC8102热处理基准审核标准【1】
标题:热处理基准审核标准 关键词:AC8102 1. INSTRUCTIONS TO SUPPLIER TO BE AUDITED 1.1 Prior to the Audit 1.1.1 The S ...
-
广州市MedAccred _AC8102热处理基准审核标准【2】
Quality system certification 1.2 During the Audit 1.2.1 The Supplier should provide for an in-briefi ...
-
邹平市MedAccred _AC8102热处理基准审核标准【4】
3.4.2 Are the specification required parameters for the complete heat treatment cycle including, but ...
-
山东省MedAccred _AC8102热处理基准审核标准【5】
pre-defined frequencies? YES/NO 3.8.3 (C) Is there evidence that changes, such as new product introd ...
-
潍坊市MedAccred _AC8102热处理基准审核标准【6】
5.3.1 Does the internal procedure require that all PH steel parts with any finish machined surfaces ...
-
青岛市MedAccred _AC8102热处理基准审核标准【7】
YES/NO (INFO) NOTE: If the Supplier performs metallography/microhardness testing for acceptance of p ...
-
威海市MedAccred _AC8102热处理基准审核标准【8】
9.2.2 Do records indicate that the inspection and maintenance have been performed in accordance with ...
-
烟台市MedAccred _AC8102热处理基准审核标准【9】
applicable specifications? YES/NO 9.11 Polymer Quenchants SECTION NA 9.11.1 Is there a system in pla ...
-
东营市MedAccred _AC8102热处理基准审核标准【10】
11.2.1.3 Quench gas purity and dew point? YES/NO 11.2.2 Does the calibration interval of the vacuum ...