仙桃市MedAccred _AC8121电子电缆和线束组件的审核标准 (65)

31.1.13 C- Is tooling used in the molding process cleaned according to the procedure?YES/NO

31.1.14 C- Is there evidence of preventative maintenance and calibration of equipment, including ovens, gauges, and scales, used in the molding process?YES/NO/NA

Audit Note: NA only applies when ovens are not used (i.e. air cure only).

31.1.15 C- Is there evidence that temperature, humidity, particles, and ventilation of the room are controlled according to procedures for the molding process?YES/NO

31.1.16 C- Is there control of contaminants in the environment in which the molding material is applied, which minimizes Foreign Object Debris (FOD)?YES/NO

31.1.17 C- Is there control of contaminants in the environment in which the molding material is applied, which minimizes Foreign Object Debris (FOD)?YES/NO/NA

Audit Note: NA applies when rework is not allowed.

31.2 Molding Inspection

31.2.1 P- If required by Customer, are there requirements to conform to national / international standards for molding?YES/NO/NA

31.2.2 P- Is there a procedure for the acceptance criteria of molded parts, including:

31.2.2.1 P- Verification of thickness and hardness, if required?YES/NO/NA

31.2.2.2P- Coverage?YES/NO

(0)

相关推荐