Printed Circuit Boards Assembly (PCBA) Process | PCBCart
相关推荐
-
【博文精选】扫盲帖,什么是PCB?
什么是PCB? PCB=printed circuit board;中文名称为印制电路板,又称印刷线路板,是重要的电子部件,是电子元器件的支撑体,是电子元器件电气连接的载体.由于它是采用电子印刷术制作 ...
-
张家港TPG_AC7120认证_AC7120_电路卡组件的审核标准(4)
3.1 Audit Scope Note: Both "Performed On-site" and "Outsourced" boxes can be mar ...
-
郴州市MedAccred _AC8121电子电缆和线束组件的审核标准 (75)
35.1.11 C- Is there evidence for the inspection for damaged wire / braid / shield after stripping?YE ...
-
深圳TPG_AC7120认证_AC7120_电路卡组件的审核标准(7)
9 RECEIPT, INSPECTION & CONTROL OF INCOMING MATERIAL 9.1.P Are there procedures that define: a.P ...
-
汕头市MedAccred _AC8121电子电缆和线束组件的审核标准 (34)
13.27 C- When major elements of the proven materials, processes or equipment are initially launched ...
-
佛山市MedAccred _AC8121电子电缆和线束组件的审核标准 (41)
19.17 C- During the rework process do the handling, storage and control of the assembly, components ...
-
长沙市TPG_AC7120认证_AC7120_电路卡组件的审核标准(5)
5 PROCEDURE FOR PROCESS CONTROL 5.1.P If solder alloys / flux are not specified by customer, is ther ...
-
宝鸡市TPG_AC7120认证_AC7120_电路卡组件的审核标准(17)
17.4.6.C Are the soldering tools set to the specified temperature for the solder alloy being used an ...
-
常熟市TPG_AC7120认证_AC7120_电路卡组件的审核标准(12)
14.5 Build Through / Build Short N/A 14.5.1.P Is there a procedure that defines: YES/NO a.P - Requir ...
-
山东省MedAccred -AC8121电子电缆和线束组件的审核标准 (15)
30.3 Assembly of Sleeving and Boots to Connector Bodies [ ] 30.4 Connector Damage Mandatory 30.5 Ins ...