乌鲁木齐市MedAccred _AC8102热处理基准审核标准【33】

16.3.3 (EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT

SHOP PAPER

REQUIREMENT

ACTUAL

Atmosphere

(EC)

(EC)

(EC)

Time and Tolerance

(EC)

(EC)

(EC)

Time loaded into

furnace

Time start of soak

(EC)

Time end of soak

(EC)

Media for Cooling

(EC)

(EC)

(EC)

Cooling Rate

(Excluding Quench)

(EC)

(EC)

(EC)

16.4 Testing for the abbreviated Job #3 SECTION NA

16.4.1 (EC) Testing requirements by Specification, P/O or Drawing

16.4.1.1 (EC) Shop paper testing requirements

16.4.1.2 (EC) Actual testing performed:

16.5 Job Acceptance

16.5.1 Is the operation signed off or data recorded only after completion? YES/NO

16.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES/NO

17. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS HEAT TREATING JOB SECTION NA

17.1 Job #4 Identity

17.1.1 Purchase order number:

17.1.2 Customer:

17.1.3 Job number, Part number:

17.1.4 Part description:

17.1.5 Part size:

17.1.6 Maximum part thickness:

17.1.7 Number of parts:

17.1.8 (EC) Material alloy, Material specification (if available):

17.1.9 (EC) Heat Treating specification:

17.1.10 (EC) Heat treat and other process and test requirements specified by customer specification (i.e. fixed process approval):

17.1.11 (EC) Pre-heat treatment requirements (cleaning, plating, etc.)

17.1.12 (EC) Pre-heat treatment actually performed:

17.2 Thermal Treatment Step One SECTION NA

17.2.1 Step One

17.2.1.1 Furnace used:

17.2.1.2 Date part(s) processed:

17.2.2 Does the furnace possess the control and recording instrumentation required by the governing specification for this heat treatment? YES/NO

17.2.3 (EC) Step One – Temperature

REQUIREMEN

T

SHOP PAPER

REQUIREMENT

SET

TEMPERATUR

E

ACTUAL

TEMPERATURES

Temperature

(EC)

(EC)

(EC)

Check if used

Control

(EC)

Recorder

(EC)

High/Low -

Type A or C

Instrumentation

(EC)

Load

Thermocouples

(EC)

(0)

相关推荐